Unrivaled level of service, just like the machine.
Purchasing
Shipping / Delivery Schedule
The duration for the delivery could be different by the method of shipment and the delivery location. For more information about Shipping, please refer to Purchase Guide.
Upon contract execution, it takes about 4~6 weeks for hand-crafted production of the roaster. It is recommended that customers prepare for receiving and installing the product during this time.
It is important to understand the installation requirements prior to installing the machine. Please evaluate the installation requirements and make sure they are or can be met before you receive the product.
Please contact Stronghold Service team if you have any questions about the installation requirements.
Electrical
Please supply a single-phase 220V electricity with at least 3.5kW power capacity.
※ Please use a dedicated, independent 30A circuit breaker with proper ground connection to supply electricity to the machine.
※ If your electricity supply is not 60Hz, please consult Stronghold and use the proper Frequency Converter
Exhaust
Size of the exhaust duct shall be around 80mm, 100mm
(With Smoke Filters, there must be 2 exhaust ducts, both fitted for 100mm)
※ You may need a pipe or space to connect to the exterior of the place for safe operation
※ The length or exhaust duct or its degree of bend can affect the performance of the machine.
Space Requirements
Please prepare a location with space clearance of at least 650 x 620 x 885 mm
※ If the machine is purchased with the smoke filter, at least 747 x 859 x 1410 mm clearance is required.
※ We recommend placing the roasting machine at a height where the operator can comfortably reach the hopper to load coffee.
Electrical
Please supply a single-phase 220V electricity with at least 5.8kW power capacity.
※ Please use a dedicated, independent 30A circuit breaker with proper ground connection to supply electricity to the machine.
※ If your electricity supply is not 60Hz, please consult Stronghold and use the proper Frequency Converter
Exhaust
Size of the exhaust duct shall be around 80mm, 100mm
(With Smoke Filters, there must be 2 exhaust ducts, both fitted for 100mm)
※ You may need a pipe or space to connect to the exterior of the place for safe operation
※ The length or exhaust duct or its degree of bend can affect the performance of the machine.
Space Requirements
Please prepare a location with space clearance of at least 650 x 620 x 885 mm
※ If the machine is purchased with the smoke filter, at least 747 x 859 x 1410 mm clearance is required.
※ We recommend placing the roasting machine at a height where the operator can comfortably reach the hopper to load coffee.
Electrical
Please supply a 3-Phase, 4-Wire 380V electricity with at least 20kW power capacity.
※ Please use a dedicated, independent 40A circuit breaker with proper ground connection to supply electricity to the machine.
※ Please contact Stronghold service technician if you have any questions about the electricity requirements.
Exhaust
Size of the exhaust duct shall be around 100mm, 200mm
(With Smoke Filters, there must be 2 exhaust ducts, fitted for 200mm, 250mm)
※ You may need a pipe or space to connect to the exterior of the place for safe operation
※ The length or exhaust duct or its degree of bend can affect the performance of the machine.
Space Requirements
Please prepare a location with space clearance of at least 975 x 835 x 1404 mm
※ If the machine is purchased with the smoke filter, at least 653 x 840 x 1955 mm clearance is required.
Electrical
Please supply a 3-Phase, 4-Wire 380V electricity with at least 35kW power capacity.
※ Please use a dedicated, independent 60A circuit breaker with proper ground connection to supply electricity to the machine.
※ Please contact Stronghold service technician if you have any questions about the electricity requirements.
Exhaust
Size of the exhaust duct shall be around 100mm, 250mm
(With Smoke Filters, there must be 2 exhaust ducts, both fitted for 250mm)
※ You may need a pipe or space to connect to the exterior of the place for safe operation
※ The length or exhaust duct or its degree of bend can affect the performance of the machine.
Space Requirements
Please prepare a location with space clearance of at least 1420 x 1250 x 1905 mm
※ If the machine is purchased with the smoke filter, at least 653 x 840 x 1955 mm clearance is required.
Education
Educational Contents
Stronghold provides a diversity of educational videos on roasting through the official Youtube channel. We also offer professional seminars and forums with coffee experts from all around the world.
Please subscribe to thh Youtube channel to see more contents.
The warranty period for Products shall end at whichever event is earliest: 12 months from installation; 1,000 roasts from first use by the original buyer; or 14 months after the date of shipment.
For further information, please refer to warranty conditions on Warranty Policy.
All non-urgent inquiries will receive a response within 48 hours via e-mail. All urgent inquiries shall be notified directly to the Stronghold representative, and the customer will be contacted within 24 hours